Built Faster, Delayed Longer: Why Modular Construction Exposes What the Industry Was Never Designed to Handle

Prix à partir de
15,18

En vedette

COMPARER TOUS LES MAGASINS EN LIGNE (2)

Description

Built Faster, Delayed Longer: Why Modular Construction Exposes What the Industry Was Never Designed to Handle

Comparer les boutiques en ligne (2)

Trier par:

15,18  3,00 € de livraison Total 18,18 

15,18  3,00 € de livraison Total 18,18 

Description (0)

Built Faster, Delayed Longer: Why Modular Construction Exposes What the Industry Was Never Designed to Handle


Spécifications du produit

Marque Independently Published
EAN
  • 9798257712043

Choix en vedette
15,18 
Voir l’offre